Legacy extrusion line with aging machinery showing visible wear, warm industrial lighting
BEFORE
Modern Extrude extrusion line running at full speed with crisp cool lighting and digital HMI displays
AFTER EXTRUDE
LIVE
Scroll
01
Extrude aluminum profile extrusion line running at full production speed in Stuttgart facility
Window Profile Manufacturing
01

Stuttgart, Germany

Fenster Profiles GmbH

"We were scrapping 18% of every run. Our tolerance drift hit ±0.8mm by the third shift and we had no visibility into why until the next morning's quality report."

— Karl Bremer, Plant Manager

Performance Delta
OEE
71%96.1%
Scrap Rate
18.2%10.9%
Tolerance
±0.8mm±0.05mm
Unplanned Maint.
16h/mo1.2h/mo

"First shift after commissioning we hit 95.4% OEE. By week three it was holding 96.1% across all three shifts. The scrap number was the one that got boardroom attention."

Karl Bremer, Plant Manager — Fenster Profiles GmbH

Request a Line Assessment
02
Precision medical tubing extrusion line with clean-room enclosure and real-time dimensional monitoring
Medical Tubing · FDA Class II
02

Minneapolis, MN

MedFlow Extrusion Corp.

"FDA validation on tubing tolerances had failed twice with our previous line. The ±0.12mm wall variation was putting our 510(k) clearance at risk and every delay cost us a hospital contract."

— Dr. Sandra Okafor, VP Operations

Performance Delta
Wall Tolerance
±0.12mm±0.018mm
FDA Validation
Failed ×2Pass Run 1
OEE
68%94.7%
Rework Cost
$41k/mo$3.2k/mo

"First validation run, first pass. The FDA inspector asked which process engineer had done the capability study. We told him it was the machine."

Dr. Sandra Okafor, VP Operations — MedFlow Extrusion Corp.

Request a Line Assessment
03
High-throughput automotive rubber extrusion line consolidating three legacy lines into single Extrude platform
Automotive Trim · Tier-1 Supplier
03

Detroit, MI

Apex Automotive Profiles

"We were running three separate lines to hit our door-seal volume. Each one needed its own operator, its own maintenance window, and its own tooling inventory. The floor space alone was killing us."

— Marcus Webb, Director of Operations

Performance Delta
Lines Required
3 lines1 line
Throughput
340 kg/hr890 kg/hr
Floor Space
4,200 ft²1,400 ft²
Operators/Shift
62

"We freed up 2,800 square feet and redeployed four operators to a new product line. The machine paid for itself in 11 months. That's not a typo."

Marcus Webb, Director of Operations — Apex Automotive Profiles

Request a Line Assessment

Free · No Commitment

Request a Line Assessment

Tell us about your current line. Our applications engineers will deliver a throughput-to-tolerance analysis within 48 hours — no sales call required.

Line Assessment Form · REV 2.4
May 29, 2026

No sales call. No obligation. Analysis delivered in 48h.

Your data is used solely to prepare your line assessment. We do not share contact information with third parties.

Not ready to talk? Bring the data to your next capex meeting.